Production of electrical panels

Execution and commissioning of main distribution panel – 3 inputs of 5.000A

  • ArTu K structure and ABB equipment
  • 3 x transformers 3.200 kVA / 5.000A and 2 transformer couplings of 5.000A
  • Inputs with withdrawable circuit breakers
  • Automatic power factor correction 3 x 1.000 kVAR

Execution and commissioning of general distribution panel- 2 inputs of 5.000A

  • ArTu K structure and ABB equipment
  • 2 x transformers 3.200 kVA / 5.000A and a coupling of 5.000A
  • Inputs with withdrawable circuit breakers
  • Automatic power factor correction 2 x 1.000 kVAR

Execution and commissioning of general distribution panel - 2 inputs of 3.200A

  • Xenergy structure and Eaton equipment
  • 2 x transformers 2.000 kVA / 3.200A and a coupling of 3.200A
  • Inputs with withdrawable circuit breakers
  • Automatic power factor correction 2 x 800 kVAR

Execution and commissioning of general distribution panel - 2 inputs of 4.000A

  • ArTu K structure and ABB equipment
  • Two inputs of 4.000A and 3 couplings of 4.000A
  • Inputs with withdrawable circuit breakers
  • Automatic power factor correction 2 x 1.000 kVAR

Execution and commissioning of main distribution panel – 3 inputs and Automatic Transfer Switch for backup power supply.

  •  Xenergy structure and Moeller equipment
  •  3 inputs; 2 x transformers 1.000 kVA + electric generator 800 kVA
  •  Inputs with withdrawable circuit breakers
  •  Automatic Transfer Switch for backup power supply ( 800 kVA )
  • The power factor is automatically compensated with a 6-stage capacitor battery.

Execution of main distribution panel

  •  Xenergy structure and Moeller equipment
  •  2 x transformers 1.600 kVA
  • Inputs with withdrawable circuit breakers
  •  The power factor correction is automatically compensated with a 6-stage capacitor battery.

 

Execution of electrical panel for additive dispensing lines

Design and execution of distribution panel for lighting

Execution and commissioning of the main distribution panel – 3 inputs and Automatic Transfer Switch for backup power supply.

  •  Xenergy structure and Moeller equipment
  •  3 inputs; 2 x transformers 1.000 kVA + electric generator 500 kVA
  •  Inputs with withdrawable circuit breaker
  •  Automatic Transfer Switch for backup power supply
  •  The power factor correction is automatically compensated with a 6-stage capacitor battery
Design, execution and commissioning of main distribution panel – 3 inputs

  •  Xenergy structure and Moeller equipment
  •  3 inputs; 2 x transformers 1000 kVA + generator 400 kVA
  •  Inputs with withdrawable circuit breaker
  •  Automatic Transfer Switch for backup power supply
  •  The power factor correction is automatically compensated with a 6-stage capacitor battery.

Design, execution and commissioning of electrical control panel for fire fighting station.

Execution, commissioning of HVAC control panels.

Design, execution and commissioning of main distribution panel – 3 inputs

  •  Xenergy structure and Moeller equipment
  •  3 inputs; 2 x transformers 1.000 kVA + generating group 400 kVA
  •  Inputs with withdrawable circuit breaker
  •  Automatic Transfer Switch for backup power supply
  •  The power factor correction is automatically compensated with a 6-stage capacitor battery.

Design, execution and commissioning of secondary distribution panels

Design, execution and commissioning of 7 electrical panels for HVAC control.

  •  Rital enclosures
  •  PLC- s ( over 1000 I/O ) and frequency converters - Siemens
  •  Switchgear and protection - Moeller

Design, execution and commissioning of general distribution panel 1.600 A

  •  Logstrup structure, Moeller equipment
  •  Inputs with withdrawable circuit breaker
  •  The power factor correction is automatically compensated with a 6-stage capacitor battery.

Design, executon and commissioning of several electric distribution panels

Design, execution and commissioning of main distribution panel – 3 inputs

  • Siemens equipment
  •  Inputs with withdrawable circuit breaker
  •  Automatic Transfer Switch for backup power supply
  •  The power factor correction is compensated with a 6 – speed capacitor

Design, execution and commissioning of control panels

  •  Switchgear and protection – Siemens
  •  PLC-s – Siemens

Execution, assembly, wiring of electrical panels and field wiring connections for 12 electric panels that control the pumping, treatment and storage of the drinking water.

  • Switchgear and protection – Moeller
  • PLC-s – Phoenix Contact

Design, execution and commissioning of a main distribution panel

  •  Xenergy structure and Moeller equipment
  •  inputs:1 x transformer 1.000 kVA + generator 400 kVA
  •  Inputs with withdrawable circuit breaker
  •  Automatic Transfer Switch for backup power supply
  •  The power factor correction is compensated with a 6-speed capacitor

The execution of BMS panels for 10 Kaufland hypermarkets in Romania

Execution of complex electrical control panels for mineral water bottling lines. 

Detailed Engineering, execution and testing for the control panels of the drinking water treatment plants in the following cities:

  • Gieβen
  • Göttigen
  • Mainz

Our clients

Eltrex_sigle-01