Motorsport Pirelli Hall – conversion of the existing hall no. 410
Surface: 12500 sqm
Power MV/LV substation, electrical installations for energy distribution, safety and emergency electrical installations, low currents installations.
Power:
• Detail design, installation, testing, commissioning assistance
• Installation of power electrical panels with Eaton equipment – 17 pieces
• Eaton MV cells + 2 x Schneider 2000 kVA transformer – purchase and installation
• Approximately 3 km cable trays, 25 km cables including optical fiber, busbars trunking system, 100 kVA generator set, 500 kVAr reactive factor compensation, lightning protection system
• Over 600 LED luminaires with DALI control system (hall + offices)
Low currents:
• Fire detection and alarm system – Siemens
• Realization of voice-data network, video surveillance system, access control system (Honeywell)