Eisenmann – Electrical installation 64-0449 NGK PL Sintering line PPK/PDK/PRK D1-D4

Project description

Kiln automation, electrical installations

Automation of the transport process (conveyors) and optimization of the sintering process.

• Detail design, assembly, testing, commissioning assistance
• Installation of power electrical panels and control panels
• Approximately 3.5 km cable trays, 48 km cables including optical fiber