Phoenix Constructions – Extension of the Mahle CM production and storage hall

Project description

Electrical installations:

• Cable pulling – range and lenght: 0.5 -> 240 mmsq; 8837 m
• Busbar trunking system: 1600 A; 25 m
• Normal lighting installation, 66 lighting fixtures
• Safety lighting with emergency kit, 74 lighting fixtures

Electrical panels:

• MDB extension, 713 KW
• Secondary energy distribution panels: TGLP- 713 KW, TELP- 128 KW, TCVLP- 14 KW
• 1 BMS cabinet
• 1 PLC Saia Burgess PCD1.M2220-C15

Similar projects