Scope of work:
• Electrical installation of 156 x LT160 machines and 108 x M137 machines
Short description:
• Electrical installation of over 250 machines
• Wiring of over 5000 field elements (sensors, actuators, etc.)
• Power supply of equipment
• I/O check and commissioning assistance