Design and execution of electrical panels, installation on site
- Design of electrical panels using Eplan P8, according to the standards of our clients, for:
- 3 pre-treatment areas – Vorbehandlungsanlage (VBH)
- 1 drying area – Haftwassertrockner (HWT)
- 1 kiln – Pulvereinbrennofen (PEO)
- Conveyor system
- AHU (air handling unit), boilers, etc.
- Production of the electrical panel in our workshop in Romania
- Purchase and delivery of materials in Germany
- Electrical installation on site
- I/O check and start-up assistance