Logistics – Indoor and outdoor electrical installations hall D

Project description

  • Detail design, assembly, testing and commissioning, staff training, “As Built” documentation
  • MDB manufacturing and installation: 1600 A, Isc = 25 kA, 1 x 1250 A output, 3 xi 100 A outputs, 2 x 250 A outputs, automatic source changeover system
  • Secondary switchboards – production and installation: 3 switchboards for offices, 6 secondary switchboards for the production hall
  • Electrical energy distribution installations and machines supply: car charging stations, sockets groups for supply the forklift trucks, dock gates supply, indoor and outdoor lighting system
  • Lighting installations without DALI system, lighting installation for production hall with linear rails trunking lighting system, 15000 sqm
  • External networks and outside lighting installations:  facade lighting installation, pole lights – 75 W, 12000 lumen/fixtures
  • Emergency and safety electrical installations:  safety and emergency lighting with local batteries, lightning protection systems (3 active pcs)
  • UPS 3 kVA for video surveillance system – Riello
  • Generator set: 2 x 18 kVA SDMO + 1 x 110 kVA AKSA – stand-by
  • Low currents electrical installations:
    • Fire detection and alarm system: Securiton, aspiration detectors (production hall), optical and thermal point detectors (offices and annex places)
    • video surveillance system: Dahua – outdoor video camera Bullet, 1/3” 4 Megapixel progressive CMOS, H.265 & H.264 dual-stream encoding, 20fps@4M (2688×1520) & 25/30fps@3M (2304×1296), WDR (120dB), Day/Night (ICR), 3DNR, AWB, AGC, BLC

Similar projects