Ambiental Control for Creel Room

INDUSTRY:

Tire Manufacturing

FOCUS:

Ensuring optimal temperature and humidity conditions for tire production materials to maintain quality and efficiency.

OBJECTIVE:

Maintain 25% relative humidity and 22 degrees Celsius in the production halls and warehouse to ensure the quality and consistency of tire production materials.

SOLUTION:

  • Air handling unit (AHU) from Flakt
  • Chiller from Daikin
  • Siemens S7-1500 PLCs for automation
  • Siemens TP1900 Comfort HMI for interface
  • Integration into the factory BMS system using Siemens WinCC
  • Field instrumentation from Siemens (sensors, actuators, valves, etc.)

PROJECT DURATION:

4 months

THE PROJECT COMPRISED OF:

Eltrex served as the general contractor for this project, in which we had to design and build an ambiental control system for a Creel Room in the tire manufacturing industry.

The main activities performed for this project were:

  • Designing the automatic temperature and humidity control system for the Creel Room with the purpose of maintaining 25% relative humidity at 22°C across the two floors of the deposit.
  • Conducting mechanical, electrical, and architectural works for the automation system, along with software development and commissioning.
  • Installing an air handling unit (AHU) from Flakt and a local chiller from Daikin.
  • Building and installing the automation cabinet based on Siemens S7 PLCs and TP1900 HMI.
  • Choosing and installing the field instrumentation (sensors, actuators, valves, etc).
  • Executing the electrical installation.
  • Developing the PLC software and making the commissioning of the system.
  • Integrating the entire process in the existing BMS based on Siemens WinCC.