Cabinets for a building materials production line

INDUSTRY:

Building materials

FOCUS:

MCC, PLC, OP and secondary cabinets for a plaster board production line

OBJECTIVE:

The control cabinets for each area of the production line had to be constructed and shipped to Spain, in several stages, according to the construction progress on site.

SOLUTION:

  • Rittal VX25 enclosures, distribution system and cabinet ventilation
  • Siemens PLC, FU and protection devices

PROJECT DURATION:

6 months

THE PROJECT COMPRISED OF:

  • 1 * MCC01 panel storage area –  4200 x 2200 x 600
  • 1 * MCC02 panel storage area – 5200 x 2200 x 600
  • 1 * MCC01  panel hammermill – 1200 x 2200 x 600
  • 1 * PLC Panel – 1200 x 2200 x 600
  • 1 * MCC01 panel calcining plant – 4800 x 2800 x 600
  • 1 * PLC 10 panel – 1200 x 2200 x 600
  • 15 * LCB0xx  secondary electrical panels
  • MCC202 dryer infeed – 3000 x 2200 x 600
  • MCC302 dryer panel – 1200 x 2200 x 600

Our client has been a European company, that was building a plaster board production line in Spain. They entrusted us with the construction of all the cabinets, according to their design.

Eltrex supplied all the materials, besides the PLC and frequency drives, which were delivered by the customer to our workshop for installation.

The FAT was done remotely, via a remote VPN access router, and with support from our technicians that were in touch with the client’s automation engineer.