INDUSTRY:
Automotive
FOCUS:
Main power distribution cabinet – 3200 A
OBJECTIVE:
Our team was entrusted with the construction of the main power distribution cabinet for a new automotive component factory in Romania.
SOLUTION:
- Eaton enclosures and protection devices
PROJECT DURATION:
3 months
THE PROJECT COMPRISED OF:
For this project, our team had to construct the following cabinets:
- 1 * Main power distribution cabinet – 3200A
- 7 * Secondary distribution cabinets (for lights, power supplies, production machines, etc)
- 1 * Power compensation cabinet
Our client has been a Romanian general contractor, that was building a new factory for a German automotive components manufacturer, in Romania. They entrusted us with the construction of all the power distribution cabinets, including the Eplan design.
Eltrex supplied all the materials for these cabinets; the supplier that we chose was Eaton, with whom we executed several big power distribution panels in the past.
The FAT was done solely by our engineering team, after which the cabinets were shipped to the new factory, where they have been installed by a local company.