Power distribution and automation cabinets for tire manufacturing plant

INDUSTRY:

Automotive

FOCUS:

PLC, OP General distribution panel 3200A, Electrical automation panel, HVAC and warehouse distribution.

OBJECTIVE:

Implementation of all distribution and automation panels in 4 months.

SOLUTION:

  • Eaton – electrical panels
  • PLC Siemens S7-1500 for automation
  • HMI Siemens TP1900 Comfort – for interface

PROJECT DURATION:

5 months

THE PROJECT COMPRISED OF:

For this project, our team had to construct the following cabinets:

  1. 1 *LVMD8 – 3200A, General distribution panel low voltage substation JT8 – 7200 x 2100 x 600
  2. 1* TEA-09 – Electrical automation panel 1200x2100x400
  3. 1*TD38.4.5 – Boilers room automation panel
  4. 1* TD38.5 – Automation Panel HVAC  3000 x 2100 x 400
  5. 1*TDUPS U16 – Panel UPS 2200x2100x400
  6. 1*TD38.4.7 – AAR Panel 800x2100x400
  7. 1*TD-R9 – Rectifier panel -600x700x270
  8. 1*Bypass UPS U16 – Bypass Panel UPS U16 800x1000x300
  9. 1*TD38.4 – Machinery distribution panel
  10. 1*TD38.1 – Machinery distribution panel
  11. 4* TD38.4.1,2,3,4 – Warehouse utilities panel 600x2100x320
  12. 2*TV-T38/T39 – Transformer ventilation switchboards 750x375x275
  13. 2*TBCF-T38/T39 – Fixed battery panels for reactive power compensation Trafo38 and Trafo39 1000x800x300
  14. 1* TBAC-T38 – Automatic battery panel for reactive power compensation 400V, 50Hz, 1000Kvar 2400x2100x600
  15. TD38.4.8 – Distribution panel for administrative building 600x760x270

This project involved electrical panels manufacturing and installations for a new tire production facility, with a build-up area of 7,140 sqm. We supplied all the electrical equipment, designed the power distribution and automation panels and executed all the installation works and software development.