INDUSTRY:
Tire Manufacturing
FOCUS:
Power distribution, safety systems, low voltage installations, and medium voltage substation
OBJECTIVE:
To upgrade and enhance the electrical infrastructure of the exiting facility to meet modern standards and improve efficiency and safety.
SOLUTION:
- Power and distribution panels: Eaton
- Transformers: Schneider
- Fire detection and alarm system: Siemens
- Voice-Data network, CCTV, and access control system: Honeywell
PROJECT DURATION:
8 months
THE PROJECT COMPRISED OF:
The project involved complete electrical installations for a new tire manufacturing facility in Romania, with a total area of 12,500 m². The scope included power distribution, safety systems, low voltage installations, and substations.
Power installations:
- Execution, Installation, Testing, and Commissioning:
- Installation of 26 Eaton-equipped power and distribution panels:
- TG1+2, 2 x 3200 A
- 7 Eaton XEnergy main power distribution panels up to 3200 A
- 17 Eaton and Schneider secondary electrical panels for power distribution up to 2000 A
- Procurement and installation of 12 Schneider transformers 2000 kVA and their corresponding Eaton medium-voltage cells.
- Approximately 25 km of cables, including fiber optics, insulated busbar;
- Electrogen Group of 100 kVA (88kW) 400/230 V diesel ENDRESS, a 500 kVAr compensation battery, Eaton UPS
- Lightning protection system.
- Installation of over 600 LED lighting fixtures with DALI control system integration (covering both the hall and office areas).
- Installation of 880 wireless sensors for temperature monitoring.
- SCADA integration of: signals from the electrical panels, power consumptions, current transformers, medium-voltage cells, diesel generator, compensation battery, DALI light control, wireless sensors for temperature monitoring.
Low Voltage Installations:
- Fire detection and alarm system by Siemens.
- Voice-data network, CCTV, and access control system by Honeywell.