INDUSTRY:
Automated paint shops
FOCUS:
The primary challenge was to design and implement a reliable and efficient automation system for the two lengthy dryers, ensuring seamless integration with the existing paint line infrastructure.
OBJECTIVE:
The main objective was to deliver a fully automated control system for the two 30-meter dryers, enhancing the operational efficiency and reliability of the paint line for oversized metallic structures.
SOLUTION:
- PLC: Siemens ET200SP
- Frequency drives: Siemens G120
- Enclosure: Schneider
- Power distribution system and protection devices: Schneider
- Cable tray: Obo
- Cables: Lapp
PROJECT DURATION:
4 months
THE PROJECT COMPRISED OF:
In this project, our client is a German company which builds automated paint shops. In this case, they made a new paint line for oversized metallic structures, including two dryers of over 30m length. The automation of the two dryers was our responsibility.
The following services were performed:
- Electrical design in Eplan P8
- Automation panel building
- On site installation
- I/O check and commissioning with the customer